Document Details |
|||||
Name of Department/Committee : | MED 08 | ||||
---|---|---|---|---|---|
Document Number : | MED 08 ( 20461) | ||||
Document Title [English] : | STEEL HEADFRAMES FOR MINES PART 1 PRINCIPLES OF LOAD COMPUTATION AND APPLICABLE FACTORS OF SAFETY | ||||
Document Title [Hindi] : | खदान के लिए स्टील हेडफ्रेम भाग 1 लोड गणना के लिए सिद्धांत और सुरक्षा के लिए लागू कारक | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 73.100.01 | ||||
Date of Project Approval : | 05-09-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Conveyors, hoisting and lifting equipments and rope ways |
Sub Sub Group : | Mine cage suspensions |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The standard lays down the principles of load computation and applicable factors of safety for steel headframes for mines used under normal and special operating conditions. This standard is not applicable to winding towers where a winding engine is installed on top of the headframe structure. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 05-09-2022 | ------- | ||
2 | P-Draft Waived | 05-09-2022 | The committee MED 08 in its 23rd meeting decided to wide-circulate the draft waiving its P-draft stage. | ------- | |
3 | WC Draft | 05-09-2022 | Duration : 60 Days Submitted for HOD approval Remarks : The document is being wide-circulated for 2 months time for public commenting |
------- | |
4 | WC Draft | 07-09-2022 | WC rejected by HOD Remarks: Please Check. |
------- | |
5 | WC Draft | 08-09-2022 | Duration : 60 Days Submitted for HOD approval Remarks : Document corrected The document is being wide-circulated for 60 days for public commenting |
------- | |
6 | WC Draft | 12-09-2022 | WC approved by HOD |