Document Details
Name of Department/Committee : MED 07
Document Number : MED 07 ( 19315)
Document Title [English] : GLOSSARY OF TERMS FOR BULK HANDLING EQUIPMENT PART 2 STACKING LOADING AND RECLAIMING EQUIPMENT
Document Title [Hindi] : बल्क हैंडलिंग उपस्कर हेतु पारिभाषिक शब्दावली ( भाग 2 – स्टैकिंग, लोडिंग एवं रिक्लेमिंग उपस्कर )
Document Type : Revision
Language : English
Priority : 3
ICS Code : ICS 53.040
Date of Project Approval : 07-04-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 10463 : Part 2: 1985
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 10463 : Part 2: 1985


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Conveyors, hoisting and lifting equipments and rope ways
Sub Sub Group : Non-powered material handling equipment
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 In this standard an attempt has been made to cover the terms which are especially applicable to stacking, loading and reclaiming equipment, Terms covering components such as systems, electrical equipment (motors, cables, switch gear, etc.) and general engineering terms relating to bearings, structure, etc, have been left out. Users of this standard are advised to refer to related standards, where applicable, covering the corresponding terminologies. This standard (Part 2) is one of the standards from the series of standards on glossary of terms relating to bulk handling equipment. The glossary of terms relating to cyclic loose bulk handling equipment (non-stationary) is given in IS 10463 (Part 6) and those of equipments for unloading, hydraulic conveying, pneumatic conveying and stationary-cyclic loose bulk handling are proposed to be covered subsequently.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 07-08-2022 22-04-2023 06-09-2023 06-04-2024 KHASHBOO KUMARI 07-04-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-04-2022 -------
2 P-Draft Waived 27-10-2022 -------
3 WC Draft 27-10-2022 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 01-11-2022 WC rejected by HOD
Remarks: Please Check.
-------
5 WC Draft 17-11-2022 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 17-11-2022 WC approved by HOD
MEDC   -------