Document Details |
|||||
Name of Department/Committee : | PGD 36 | ||||
---|---|---|---|---|---|
Document Number : | PGD 36 ( 18401) | ||||
Document Title [English] : | Male Stud Elbow Body for Oil - Hydraulic Couplings Specification Part 2 Made from Bar Stock | ||||
Document Title [Hindi] : | ऑयल हॉयड्रोलिक कॅप्लिंग के लिए मेल स्टॅड एल्बो बॉडी — विशिष्टि भाग 2 बार स्टॉक से निर्मित | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 23.100.40 | ||||
Date of Project Approval : | 28-06-2021 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Hand tools and machine components |
Sub Sub Group : | Hydraulic Fittings Tee, elbow,hoses etc. |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard specifies the dimensions, material and other requirements for male stud elbow body made from bar stock with parallel pipe threads for use in oil-hydraulic systems. | |
2 | In this revision following major changes have been made: a) Table 1 has been revised, b) Clause on surface protection has been revised and c) Clause on material has been revised ? |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 28-06-2021 | ------- | ||
2 | P-Draft Waived | 09-02-2022 | ------- | ||
3 | WC Draft | 09-02-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 10-02-2022 | WC rejected by HOD Remarks: Kindly correct as per observations given on hard copy of draft document |
------- | |
5 | WC Draft | 22-02-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 24-02-2022 | WC approved by HOD |
PGDC | ------- |