Document Details |
|||||
Name of Department/Committee : | PGD 36 | ||||
---|---|---|---|---|---|
Document Number : | PGD 36 ( 17550) | ||||
Document Title [English] : | PROFORMA FOR PURCHASE OF POSITIVE DISPLACEMENT PUMPS AND MOTORS USED IN OIL HYDRAULIC SYSTEMS ― SPECIFICATION | ||||
Document Title [Hindi] : | तेल द्रवचालित तंत्र में प्रयुक्त धनात्त्मक विस्थापन पम्प और मोटरों के क्रय के लिए प्रपत्र ― विशिष्ठ | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 23.100.10 | ||||
Date of Project Approval : | 16-03-2021 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Hand tools and machine components |
Sub Sub Group : | Fluid Power system and Hydraulic machines |
Aspects : | Others |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : | |
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard covers the data to be provided for every type of item separately as per Table 1 by manufacturer for selection of positive displacement pumps and motors used in oil hydraulic systems. | |
2 | The proforma for purchase specification for positive displacement pumps and motors has been prepared to enable a prospective buyer to collect data from various manufacturers/suppliers for the purpose of comparison. This is meant to be sent out along with enquiry by the purchaser so that the manufacturers/suppliers can fill the data and send back to the purchaser to make comparison easier for the purchaser. | |
3 | In this revision following major changes have been made: a) References have been updated. b) Table 1 has been updated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 16-03-2021 | ------- | ||
2 | P-Draft | 21-06-2021 | Covering letter generated | ------- | |
3 | P-Draft | 21-06-2021 | Duration : 30 Days | PGD 36, | ------- |
4 | Skipped to W-Draft | 16-11-2021 | Stage-Changed | ------- | |
5 | WC Draft | 16-11-2021 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 18-11-2021 | WC approved by HOD |
PGDC | ------- |