Document Details
Name of Department/Committee : PGD 19
Document Number : PGD 19 ( 16968)
Document Title [English] : Volume Grease Pump — Specification
Document Title [Hindi] : आयतन ग्रीस पम्प — विशिष्टि
Document Type : Revision
Language : English
Priority : 3
ICS Code : 75.100; 43.060.30
Date of Project Approval : 30-09-2019
Standards to be Revised :
Sl.No. Is No & Year
1 IS 9773: 1981
Standards to be Superseded :


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Hand tools and machine components
Sub Sub Group : Fluid Power system and Hydraulic machines
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Scope of the standard has been modified to include grease up to NLGI Grade 2 of 265-295 penetration number from to NLGI Grade 1 of 310-340 penetration number.
2 Clause on pressure duty has been added to classify Grease Pump based on pressure up to which they are used.
3 Clause on Performance Test has been revised based on pressure duty.
4 Fig.2 for dimensions of grease pump to be used with grease of Grade NLGI Grade 2 has been added.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 10-06-2021 25-02-2022 10-07-2022 10-02-2023 Mr. SATYENDRA 29-04-2021
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 30-09-2019 -------
2 P-Draft 10-02-2021 Covering letter generated -------
3 P-Draft 10-02-2021 Duration : 30 Days PGD 19, -------
4 Skipped to W-Draft 23-06-2021 Stage-Changed -------
5 WC Draft 23-06-2021 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 23-06-2021 WC rejected by HOD
Remarks: pl modify as per IS 12, title missing in main document
-------
7 WC Draft 23-06-2021 Duration : 60 Days
Submitted for HOD approval
-------
8 WC Draft 23-06-2021 WC approved by HOD