Document Details |
|||||
Name of Department/Committee : | WRD 23 | ||||
---|---|---|---|---|---|
Document Number : | WRD 23 ( 16777) | ||||
Document Title [English] : | Proforma for analysis of unit rate of shuttering formwork for concrete items first revision of IS 10421 | ||||
Document Title [Hindi] : | ठोस वस्तुओं के लिए शटरिंग / फॉर्मवर्क की इकाई दर के विश्लेषण के लिए प्रोफार्मा (आईएस 10421 का पहला संशोधन) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160 | ||||
Date of Project Approval : | 18-02-2020 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The first revision of this standard has been brought out to adopt the latest field practices observed while using the standard and to bring it in the latest style and format of the Indian Standards. The major changes incorporated in revision of this standard are: a) Relevant taxes and duties, wherever applicable, have been updated in calculation of unit rates to include building and other construction works (BOWC) Cess and GST. b) Provisions for contractor’s overheads and profits have been indicated. c) The number of reuse for steel and wooden shuttering/formwork has been added. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 18-02-2020 | ------- | ||
2 | P-Draft | 29-01-2021 | Covering letter generated | ------- | |
3 | P-Draft | 29-01-2021 | Duration : 30 Days | WRD 23, | ------- |
4 | Skipped to W-Draft | 18-07-2022 | Stage-Changed | ------- | |
5 | WC Draft | 18-07-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 18-07-2022 | WC approved by HOD |
WRDC WRD 23, | ------- |