Document Details |
|||||
Name of Department/Committee : | WRD 23 | ||||
---|---|---|---|---|---|
Document Number : | WRD 23 ( 16774) | ||||
Document Title [English] : | Proforma for analysis of unit rate of dewatering first revision of IS 14590 | ||||
Document Title [Hindi] : | निर्जलीकरण के प्रति इकाई दर के विश्लेलषण का प्रपत्र ( आई एस 14590 का पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160 | ||||
Date of Project Approval : | 18-02-2020 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Proforma for analysis of unit rate and Guidelines for estimating cost of the construction equipment and items of work for river valley projects. |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The standard was published in 1998. The first revision of this standard has been brought out to bring the standard in sync with the latest field practices observed while using the standard and to bring it in the latest style and format of the Indian Standards. The major changes incportated in this revision of the standard are: a) Relevant taxes and duties, wherever applicable, have been added in calculation of unit rates. b) Provisions for contractor’s overheads and profits have been indicated. c) Clarification to use proforma for different sources of power. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 18-02-2020 | ------- | ||
2 | P-Draft | 28-01-2021 | Covering letter generated | ------- | |
3 | P-Draft | 28-01-2021 | Duration : 1 Days | WRD 23, | ------- |
4 | Skipped to W-Draft | 20-05-2022 | Stage-Changed | ------- | |
5 | WC Draft | 20-05-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 23-05-2022 | WC approved by HOD |
WRDC WRD 23, | ------- |