Document Details |
|||||
Name of Department/Committee : | WRD 23 | ||||
---|---|---|---|---|---|
Document Number : | WRD 23 ( 16771) | ||||
Document Title [English] : | Proforma for analysis of unit rate of construction of embankment by mechanical means Second revision of IS 11638 | ||||
Document Title [Hindi] : | यांत्रि साधनों द्वार तटबंध निर्माण की इकाई दर के आवलन के लिए प्रारूप ( दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160 | ||||
Date of Project Approval : | 18-02-2020 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Proforma for analysis of unit rate and Guidelines for estimating cost of the construction equipment and items of work for river valley projects. |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | construction of embankment by mechanical means |
ITCHS Code : | embankment |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The major changes incorporated in this second revision of the standard are: a) Relevant taxes and duties, wherever applicable, have been added in calculation of unit rates. b) Provisions for contractors overheads and profits have been indicated. c) Further clarification, where there are separate provisions for dewatering in bill of quantity(BOQ), and d) Provisions to account for swell factor and bulk volume in case of earthwork by machinery has been indicated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 18-02-2020 | ------- | ||
2 | P-Draft | 28-12-2020 | Covering letter generated | ------- | |
3 | P-Draft | 28-12-2020 | Duration : 30 Days | WRD 23, | ------- |
4 | Skipped to W-Draft | 10-03-2022 | Stage-Changed | ------- | |
5 | WC Draft | 10-03-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 15-03-2022 | WC approved by HOD |
WRDC WRD 23, | ------- |