Document Details |
|
Name of Department/Committee : | MED 16 |
---|---|
Document Number : | MED 16 ( 15992) |
Document Title [English] : | Draft Indian Standard GAS CYLINDERS WELDED LOW CARBON STEEL CONTAINERS EXCEEDING 250 LITRES AND UP TO 1000 LITRES WATER CAPACITY FOR THE TRANSPORT OF LPG DESIGN AND CONSTRUCTION |
Document Title [Hindi] : | गैस सिलिंडर-एलपीजी के परिवहन हेतु 250 लिटर से अधिक एवं 1000 लिटर तक की पानी क्षमता वाले वेल्डित कम कार्बन स्टील कन्टेनरों के डिजाइन एवं निर्माण का प्रस्तावित भारतीय मानक मसौदा |
Document Type : | New |
Language : | English |
Priority : | 2 |
ICS Code : | 23.20.30 |
Date of Project Approval : | 04-03-2020 |
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Industrial and other gases, Gas Cylinders and Fittings, boilers and pressure vessels |
Sub Sub Group : | Gas Cylinder Design & Testing |
Aspects : | Product Specification |
Risk : | High |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This Indian standard specifies the minimum requirements for the material, design, fabrication, workmanship, inspection, testing, manufacture and marking of refillable welded carbon steel containers exceeding 250 litres up to 1000 litres water capacity for liquefied petroleum gases (see IS 4576). |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 04-03-2020 | ------- | ||
2 | P-Draft | 21-07-2020 | Covering letter generated | ------- | |
3 | P-Draft | 21-07-2020 | Duration : 41 Days | MED 16, : , | ------- |
4 | Skipped to W-Draft | 03-05-2021 | Stage-Changed | ------- | |
5 | WC Draft | 20-05-2021 | Duration : 60 Days Submitted for HOD approval Remarks : HMED MAY CONSIDER AND APPROVE THE DOCUMENT FOR WC |
------- | |
6 | WC Draft | 20-05-2021 | WC approved by HOD |
MEDC MED 16, MED 16 : P21, MED 16 : P22, MED 16 : P23, | ------- |
7 | WC Draft | 08-10-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The document was approved for wide circulation for 30 days via email on 03rd October 2024 |
------- | |
8 | WC Draft | 11-10-2024 | WC rejected by HOD Remarks: Please correct the document |
------- | |
9 | WC Draft | 17-10-2024 | Duration : 30 Days Submitted for HOD approval Remarks : Changes as suggested have been incorporated |
------- | |
10 | WC Draft | 17-10-2024 | WC approved by HOD |
MEDC MED 16, MED 16 : P21, MED 16 : P22, MED 16 : P23, | ------- |