Document Details |
|
Name of Department/Committee : | PCD 06 |
---|---|
Document Number : | PCD 06 ( 14176) |
Document Title [English] : | TRACKLESS EMULSION SPECIFICATION |
Document Title [Hindi] : | TRACKLESS EMULSION – SPECIFICATION |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 93.080.20 |
Date of Project Approval : | 05-10-2018 |
Standards to be Superseded : |
Classification Details |
|
Group : | Coal and Petroleum products |
Sub Group : | Coal and related products |
Sub Sub Group : | Bitumen and Tar products |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: | Others : |
Sl.No. | Synosis Points | |
1 | Trackless emulsions may be used as a binder for tack coat, penetration macadam, surface dressing (chip seal), fog seal, cold recycling, and preparation of cold pre-mix for construction and maintenance of roads as well as a binder for micro-surfacing and slurry seal applications. One of the major constraints for bitumen emulsions when used for tack coat is that bitumen residue sticks to the construction truck tyres which leads to inefficient tack coat. Therefore, to address such issue, trackless emulsion may be used as a binder for tack coat. However, its application is not limited to the tack coat and fog sealing. These may also be used for other applications of construction and maintenance like cold mixes, storable cold mixes for patch repairs etc. These applications are not covered in this standard. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 05-10-2018 | ------- | ||
2 | P-Draft | 04-06-2019 | Covering letter generated | ------- | |
3 | P-Draft | 04-06-2019 | Covering letter generated | ------- | |
4 | P-Draft | 07-06-2019 | Duration : Days | PCD 6, | ------- |
5 | Skipped to W-Draft | 02-12-2019 | Stage-Changed | ------- | |
6 | WC Draft | 02-12-2019 | Covering letter generated | ------- | |
7 | WC Draft | 02-12-2019 | Duration : 60 Days Submitted for HOD approval Remarks : The Committee decided to issue the document into wide circulation |
------- | |
8 | WC Draft | 24-12-2019 | WC approved by HOD |
PCDC | ------- |
9 | WC Draft | 24-05-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
10 | WC Draft | 24-05-2022 | WC approved by HOD |
PCDC | ------- |
11 | WC Draft | 21-06-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
12 | WC Draft | 24-06-2024 | WC approved by HOD |
PCDC | ------- |