Document Details |
|||||
Name of Department/Committee : | CED 43 | ||||
---|---|---|---|---|---|
Document Number : | CED 43 ( 14797) | ||||
Document Title [English] : | Methods of test for soils: Part 2 Determination of water content [third revision of IS 2720 (Part 2)] | ||||
Document Title [Hindi] : | मृदा के लिए परीक्षण पद्धतियाँ: भाग 2 जल मात्रा का निर्धारण [आईएस 2720 (भाग 2) तीसरा पुनरीक्षण] | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.020, 13.080.20 | ||||
Date of Project Approval : | 22-08-2019 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Soil Mechanics and Ground Improvement |
Aspects : | Methods of tests |
Risk : | Medium |
Certification : | None |
Short Commom Man's Title : | Determination of water content of soil |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Not Equivalent |
Identical/Equivalent Standards : | ISO 17892-1:2014 |
Organization Type: | ISO |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-08-2019 | ------- | ||
2 | P-Draft Waived | 01-11-2019 | ------- | ||
3 | WC Draft | 01-11-2019 | Covering letter generated | ------- | |
4 | WC Draft | 01-11-2019 | Duration : 60 Days Submitted for HOD approval |
------- | |
5 | WC Draft | 01-11-2019 | WC approved by HOD |
CEDC | ------- |