Document Details |
|||||||||||||
Name of Department/Committee : | CED 43 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Document Number : | CED 43 ( 12408) | ||||||||||||
Document Title [English] : | Draft Standard for Design and Construction of Machine Foundations - Code of Practice: Part 1 General Provisions Revision of IS 2974Parts 1 to 5 | ||||||||||||
Document Title [Hindi] : | मशीनों की नींव का डिज़ाइन एवं निर्माण - रीति संहिता: भाग 1 सामान्य प्रावधान का भारतीय मानक मसौदा [IS 2974 (भाग 1 से 5) का पुनरीक्षण] | ||||||||||||
Document Type : | Revision | ||||||||||||
Language : | English | ||||||||||||
Priority : | 3 | ||||||||||||
ICS Code : | 93.020 | ||||||||||||
Date of Project Approval : | 15-02-2018 | ||||||||||||
Standards to be Revised : |
|
||||||||||||
Standards to be Superseded : |
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Foundation, underground structures, soil and rock mechanics |
Sub Sub Group : | Foundation Engineering |
Aspects : | Code of Practice |
Risk : | High |
Certification : | Not Certifiable |
Short Commom Man's Title : | Machine Foundations |
ITCHS Code : | NA |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: | Others : |
Sl.No. | Synosis Points | |
1 | It covers general provisions relating to design criteria and construction of foundations and structures supporting variety of rotary, reciprocating, impact and other machines associated with various industries. | |
2 | This is Part 1 of IS 2974 which is being revised in 8 Parts. The first 5 Parts would be brought out in first phase, and the remaining 3 in the second phase. | |
3 | The general provisions applicable to all types of machine foundations, such as general terminology, machine types, foundation types, load data, general load combinations, soil dynamics investigation outlines, geotechnical data, machine parameters/data, general construction requirements, observations after commissioning of the equipment, permissible amplitude of vibrations, etc are covered in this Part. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 15-02-2018 | ------- | ||
2 | P-Draft | 16-02-2018 | Duration : Days Remarks : Updated from backend on 17-08-2020 as the same was not uploaded by MS in the module, requested received from CED vide email 17-08-2020 |
CED 43, | ------- |
3 | WC Draft | 17-08-2020 | Stage changed from backend | ------- | |
4 | Skipped to W-Draft | 17-08-2020 | Stage-Changed | ------- | |
5 | WC Draft | 18-08-2020 | Covering letter generated | ------- | |
6 | WC Draft | 18-08-2020 | Covering letter generated | ------- | |
7 | WC Draft | 18-08-2020 | Covering letter generated | ------- | |
8 | WC Draft | 18-08-2020 | Duration : 58 Days Submitted for HOD approval |
------- | |
9 | WC Draft | 18-08-2020 | WC approved by HOD |
CEDC | ------- |
10 | WC-Draft | 21-08-2020 | WC-Draft Email Notifications Sent | CEDC, CED 43, MED 0, CED 43 : P8, | ------- |